Grants for construction or improvement

This document was generated with AI to make it easier to keep the documentation up to date. The text has been reviewed by a human.

Use this form to apply, on behalf of a municipality, for a grant for construction or improvement in a municipal fishing port. You can apply for grants for fixed and floating quays, wave dampers, breakwaters and dredging in new or existing port areas.

Go to the form (in Norwegian)

Before you start

  • You do not need to log in.
  • The form itself is only available in Norwegian (Bokmål and Nynorsk). Switch language at the top of the page to fill it in. Below, each field is given with its Norwegian label first and an English translation in brackets.
  • Municipalities and municipal port authorities can apply for grants for fishing port measures.
  • Applications open every year in December or January. The deadline is 1 March.
  • Check whether your measure is eligible by reading the guidelines for grants for municipal fishing port measures (PDF, in Norwegian).
  • Do not submit sensitive information or documents exempt from public disclosure here. Use eDialog instead.
  • Before submitting, you must confirm that you understand the conditions for receiving a grant:

    • The grant can only be given to municipalities in Norway and must be used for fishing port measures. The design must follow current regulations and Norwegian standards.
    • Facilities built with a state grant must be owned by the municipality and be publicly accessible in line with the purpose of the construction.
    • The projects must not give individual users exclusive rights.
    • The measure must be completed and a final report submitted within the set deadlines.

The application is extensive. It is a good idea to have your project texts, statistics for the last three years, cost estimates per measure, and drawings and zoning maps as files ready before you start.

What we ask for

All fields must be filled in, except those marked optional (valgfritt) in the form.

1. Søker (Applicant)

  • Prosjektnavn (Project name, required): For example the type of measure and the place.
  • Navn på fiskerihavn (Name of fishing port, required)
  • Gårds- og bruksnummer (gnr./bnr.) (Cadastral unit numbers, required): Written as farm number/holding number, for example 400/2. Each number can have one to four digits.
  • Oppstart (Start) and Ferdigstilling (Completion) (required): When the project starts and when it will be finished.
  • Org. nr. (Organisation number, required): The organisation number of the municipality or port authority, nine digits. The name is filled in automatically, and you cannot continue if we cannot find it.
  • Kommune (Municipality, required): Choose the municipality from the list.
  • Kontonummer (Bank account number, required): Eleven digits.
  • Kontaktperson (Contact person, required): Fullt navn (Full name), E-post (Email) and Telefonnummer (Phone number). The phone number must be a Norwegian eight-digit number, or a foreign number starting with its country code, for example +46. The receipt with a copy of the application is sent to the email address.

2. Prosjekt (Project)

  • Type tiltak (Type of measure, required): Choose one or more of fast kai (fixed quay), flytende kai (floating quay), bølgedemper (wave damper), molo (breakwater) and utdypning (dredging). Your choice decides which cost tables you fill in under Finansiering.
  • Beskrivelse av prosjektet (Project description, required): Information about the municipality, the measure, dimensions, purpose and who the facility is built for.
  • Mål (Objectives, required): The objectives of the measure and the expected effects for users. They must be in line with the objectives of the grant scheme.
  • Samfunnsnytte (Benefit to society, required): Describe and document the need for and benefit of the construction for the fishing industry.
  • Næringsaktivitet (Business activity, required): The fishing and aquaculture industry in the municipality and the county, its development over the last three years and the expected development as a result of the measure. Also describe existing conditions, such as public quays, aquaculture, fish landing facilities and other port conditions.
  • Eier kommunen hele området der tiltaket skal gjennomføres? (Does the municipality own the entire area where the measure will be carried out?, required): Yes (Ja) or no (Nei).
  • Avtale med grunneier (Agreement with the landowner, optional, shown if you answered no above): Upload the agreement with the landowner if you have one. A lease for a floating quay or floating wave damper must run for 15 years, and for a fixed quay or fixed breakwater for 20 years.
  • Foreligger bekreftelse fra kommunens planavdeling? (Is there confirmation from the municipal planning department?, required): Yes or no. The measure must be in line with the land-use plan under the Planning and Building Act.
  • Kommentar (Comment, required if you answered no above): Explain why you are applying for a grant even though the measure is not in line with the land-use plan.
  • Marker i kart (Mark on map, required): Mark at least one point, line or area where the measure will be, and give each marking a short description.
  • Plan- og snittegninger (Plan and section drawings, required): Drawings of the measure you are applying for. At least one file.
  • Plankart for området (Zoning map for the area, required): The land-use plan and zoning plan, which you can find in SePlan. At least one file.
  • Situasjonsplan (Site plan, required): A map showing land use in the quay and port area and property ownership, see section 9.7 of the guidelines. At least one file.

3. Statistikk (Statistics)

For each item below, you give figures for this year, last year and two years ago. All figures are required.

  • Fiskere blad A og B, på stedet til tiltaket (Fishers registered in list A and B, at the site of the measure): Number.
  • Fiskefartøyer hjemmehørende, på stedet til tiltaket (Fishing vessels registered at the site of the measure): Number.
  • Årlig ilandbrakt fisk, på stedet til tiltaket (Fish landed annually at the site of the measure): Amount in tonnes.
  • Fiskere på stedet til tiltaket, som drar direkte nytte av tiltaket (Fishers at the site who benefit directly from the measure): Number. Benefiting directly means being affected by the construction, for example vessels that get access, or better access, to a port after dredging.
  • Sysselsatte på stedet som drar nytte av tiltaket (People employed at the site who benefit from the measure): Number of people employed on land in front-line jobs directly linked to fishing services and similar.
  • Fartøyer som drar direkte nytte av tiltaket (Vessels that benefit directly from the measure): Number.

4. Finansiering (Funding)

  • Kommunens andel (Municipality's share) and Omsøkt andel fra Kystverket (Share applied for from the Norwegian Coastal Administration) (required): As a percentage.
  • Annen offentlig finansiering (Other public funding, required): In NOK. Support that can be linked to the costs in the project that are eligible for a grant. Enter 0 if you have none.
  • Annen finansiering (Other funding, required): In NOK. Enter 0 if you have none.
  • Totalkostnad (eks. mva.) (Total cost excluding VAT) and Omsøkt beløp fra Kystverket (eks. mva.) (Amount applied for from the Norwegian Coastal Administration excluding VAT) (required): In NOK.
  • Informasjon om kostnadsoverslaget (About the cost estimate, required): Whether the estimate is based on a tender (Anbud) or calculated (Kalkulert).
  • Cost per measure (required): For each type of measure you chose under Prosjekt, you fill in two tables in NOK excluding VAT. Enter 0 for items with no costs. If you have several measures of the same type, add more with the button below the table.

    • Tabell A (Table A) has the items for the type of measure, for example site costs, filling, dredging, mooring or navigation installations. Each item states whether the grant basis is 50 percent or assessed individually.
    • Tabell B (Table B) has Uforutsette (maks 15% av A) (Contingencies, max 15% of A) and Planlegging/prosjektering (maks 10% av A) (Planning and design, max 10% of A). The total cost is calculated for you.

5. Se gjennom (Review)

You check your information before submitting. If something is not filled in correctly, you can go back to that step and correct it. When you submit, you confirm that you understand the conditions for receiving a grant.